Sweatband Steel Building project Miller, SD
Read MoreL.G. Everist’s new industrial development in Lincoln County. New ready-mix plant off the Interstate 29 exit just outside of Harrisburg on the southeast corner of the interchange.
Read MoreKeep up with Raeco. Checkout the Fall Newsletter!
Read MoreAt Raeco we are determined to do things the right way. We will never cut corners, and we won’t accept subpar work from our team or any subcontractors.
Read MorePre-engineered metal buildings have many advantages when it comes to commercial building applications. In fact, we think these buildings are pretty much perfect for commercial uses. Below we’ve listed several different use cases and why you should consider this affordable and flexible solution.
Read MoreIf you're like most people, the thought of hiring a general contractor to oversee your construction project is daunting. There are so many things that can go wrong, and it's hard to know who to trust. How do you know if the builder you hire will be reliable?
Read MoreSo what is a pre-engineered steel building, and why should I be considering it for my building project? Great question. Let's start with the basics and build from there. In its most basic form, a pre-engineered building is constructed in a factory and then delivered to a building site, ready to be erected.
Read MoreTrussbilt's warehouse expansion wrapped up in early summer 2021. Raeco Builders was excited to be part of this enormous undertaking.
Read MoreIn 2020 Wolf Creek Colony took the first steps in growing its manufacturing operations; the need for a new and larger building had come. Like many Hutterite colonies, Wolf Creek Colony is self-sufficient, creating many specialized and custom products onsite. Currently, they specialize in rotation molded plastic. With the new building, they were expanding into metal fab and steelwork, and a new venture into paper products.
Read MoreIn 2019, RAECO Builders had the pleasure of working with the University of South Dakota on a new concrete student parking lot. The project came with the standard needs of a concrete parking lot pour except for the timeframe. The lot needed to be ready for the student's return to campus in the Fall.
Read MoreIn 2019 Ideal's owner, Blake Dede, knew they had outgrown their current space and needed to upgrade to a custom building that would meet their existing needs, as well as provide room for the company to continue to grow.
Read More